External renovations: tidying up the back area. Part four. Finishing.

Have just had the final inspection by the building surveyor. Excellent news, only two very minor things need doing. Neither of which will stop the completion certificate being issued.

Now only the plumbing certificate to be dealt with!!!

It has been a long renovation, nearly two years but finally got there.

Below is a slide show of the carport being built and some of the shed on the right hand side.  We used Advantage builders to build the frame and Launceston Plumbing and Gas to do the box gutter, and storm water. A 15amp outlet has been fitted under carport to facilitate future EV charging.

This slideshow requires JavaScript.

Now to some of the sustainable detail.

  • Carport roof. Recycled the long lengths of zincalume that came from the dining room roof.
  • Recycled tin from old shed roof in used as detail of underside of box gutter
  • Old hardwood studs from shed used as screen uprights
  • Coloured coversheets of colorbond used as screen insert
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s