Once all the unbuilding was finished it was time to start the rebuild. We called in Dean from Advantage builders again to realign the back lobby and pergola roof. Meanwhile we started to reclad the laundry. The wall closest to the house faces south and gets no sunlight and can be a bit damp so we used “Dune” colorbond matching the roof colour. The rear wall gave us the opportunity to use galvanised iron taken off the dining room roof. Lastly we rebuilt the north wall where the other shed had met and basically there was no wall. The studs were Tassie oak originally taken out of a friends house. This was clad in weatherboards that had been taken off the south side originally and stripped.
Advertisements